daily spaceflight news

today's moon waning gibbous

Wednesday 16 April 2014

This diagram illustrates the positions of Mars, Earth and the sun during a period that occurs approximately every 26 months, when Mars passes almost directly behind the sun from Earth's perspective. - NASA/JPL-Caltech

This diagram illustrates the positions of Mars, Earth and the sun during a period that occurs approximately every 26 months, when Mars passes almost directly behind the sun from Earth's perspective. - NASA/JPL-Caltech

Planetary

The Sun Will Disrupt Mars Communications During April (Video)

Line of Sight Blocked as Mars Passes Directly Behind Sun

PASADENA, Calif. – The positions of the planets next month will mean diminished communications between Earth and NASA’s spacecraft at Mars.

Mars will be passing almost directly behind the sun, from Earth’s perspective. The sun can easily disrupt radio transmissions between the two planets during that near-alignment. To prevent an impaired command from reaching an orbiter or rover, mission controllers at NASA’s Jet Propulsion Laboratory, Pasadena, Calif., are preparing to suspend sending any commands to spacecraft at Mars for weeks in April. Transmissions from Mars to Earth will also be reduced.

The travels of Earth and Mars around the sun set up this arrangement, called a Mars solar conjunction, about once every 26 months.

“This is our sixth conjunction for Odyssey,” said Chris Potts of JPL, mission manager for NASA’s Mars Odyssey, which has been orbiting Mars since 2001. “We have plenty of useful experience dealing with them, though each conjunction is a little different.”

The Mars solar conjunctions that occur once about every 26 months are not identical to each other. They can differ in exactly how close to directly behind the sun Mars gets, and they can differ in how active the sun is. The sun’s activity, in terms of sunspots and solar flares, varies on a 22-year cycle.

This year, the apparent angle between Mars and the sun (if you could see Mars against the glare of the sun–but don’t try, because it’s dangerous to the eyes) will slim to 0.4 degree on April 17. The sun is in a more active period of solar flares for its current cycle, compared to the 2011 conjunction, but this cycle has been relatively mild.

“The biggest difference for this 2013 conjunction is having Curiosity on Mars,” Potts said. Odyssey and the Mars Reconnaissance Orbiter relay almost all data coming from Curiosity and the Mars Exploration Rover Opportunity, as well as conducting the orbiters’ own science observations.

Transmissions from Earth to the orbiters will be suspended while Mars and the sun are two degrees or less apart in the sky, from April 9 to 26, with restricted commanding during additional days before and after. Both orbiters will continue science observations on a reduced basis compared to usual operations. Both will receive and record data from the rovers. Odyssey will continue transmissions Earthward throughout April, although engineers anticipate some data dropouts, and the recorded data will be retransmitted later.

The Mars Reconnaissance Orbiter will go into a record-only mode on April 4. “For the entire conjunction period, we’ll just be storing data on board,” said Deputy Mission Manager Reid Thomas of JPL. He anticipates that the orbiter could have about 40 gigabits of data from its own science instruments and about 12 gigabits of data from Curiosity accumulated for sending to Earth around May 1.

NASA’s Mars Exploration Rover Opportunity is approaching its fifth solar conjunction. Its team will send no commands between April 9 and April 26. The rover will continue science activities using a long-term set of commands to be sent beforehand.

“We are doing extra science planning work this month to develop almost three weeks of activity sequences for Opportunity to execute throughout conjunction,” said Opportunity Mission Manager Alfonso Herrera of JPL. The activities during the conjunction period will not include any driving.

Curiosity, the newest asset on Mars, can also continue making science observations from the location where it will spend the conjunction period. Curiosity’s controllers plan to suspend commanding from April 4 to May 1.

“We will maintain visibility of rover status two ways,” said Torsten Zorn of JPL, conjunction planning leader for the mission’s engineering operations team. “First, Curiosity will be sending daily beeps directly to Earth. Our second line of visibility is in the Odyssey relays.”

JPL, a division of the California Institute of Technology, manages the projects operating both NASA Mars orbiters and both Mars rovers for NASA’s Science Mission Directorate, Washington.

Be Sociable, Share!

Tags: , , , , , , , , , , , , , ,

Leave a Reply



sddefault

Video

A ‘Go’ To Build OSIRIS-REx on This Week @NASA

Here’s some of the stories trending on the weekly video magazine: OSIRIS-REx build go ahead,
read more »

Rocket designer Tom Mueller poses with rocket engines on the SpaceX factory floor in Hawthorne, California. - Roger Gilbertson

News

Aerospace Tax Break Bill Goes to California Governor

Ten Year Moratorium on Space Hardware Aims to Keep Firms from Leaving State SACRAMENTO, CALIF.
read more »

Concept of SNC’s Dream Chaser® spacecraft landing on the runway at Houston’s Ellington Field. - SNC

Orbit

Agreement to Explore Dream Chaser Use of Houston Space Port

Sierra Nevada and Houston Airport System Will Study Physical, Operational and Regulatory Requirements HOUSTON, Texas
read more »

Bill will enable sRLV's to hold simultaneous commercial licenses and launch permits. - (photo) Virgin Galactic

Sub orbit

Committee Passes Bill Allowing FAA to Issue Permits and Licenses for Same Vehicle

Senate Bill Will Speed Further Development of XCOR Aerospace and Virgin Galactic Space Planes WASHINGTON,
read more »

Concept of NASA's OSIRIS-REx spacecraft preparing to take a sample from asteroid Bennu. - NASA/Goddard

Planetary

Asteroid Sampler OSIRIS-REx Moves from Paper to Metal Bending

NASA Spacecraft Scheduled to Rendezvous with Asteroid Bennu in 2018 WASHINGTON, D.C. — NASA’s team
read more »

sddefault

Video

LDSD: We Brake for Mars

A entertaining and informative video from JPL: NASA tests a supersonic parachute under Mars-like conditions
read more »

The XCOR® Lynx® Mark I cockpit in its shipping cradle; in the background the fuselage and liquid oxygen tank being prepped for integration and testing. - XCOR Aerospace

Sub orbit

XCOR Aerospace Receives Lynx Mark I Cockpit

Key Subsection Enables Plane Assembly to Begin MOJAVE, Calif. — XCOR Aerospace announced today that
read more »

Screen Shot 2014-04-08 at 12.09.27 PM

Video

Copernicus Satellite Sentinel-1A Rides Into Space

Sentinel-1 is the first in the family of satellites for Europe’s Copernicus program. It carries
read more »

Part of the current U.S. Air Force space program, the X-37B space plane. - USAF

News

Will the Air Force have a Role in Deep Space?

by edward wright Lieutenant Colonel Peter Garretson asks whether the US Air Force will have
read more »

The SOHO LASCO C2 instrument captured this image of the Earth-directed Coronal Mass Ejection. - ESA/NASA

Environment

Living in Space: Radiation

by liam ginty As we push toward a space settlement future, some of the earliest
read more »

Daily spaceflight news

We are a news content generation and aggregation website covering space, with emphasis on the personal and commercial spaceflight industry.

Our mission is to document for the general public the dawn of this new epoch in mankind's history, and to make young students aware of the opportunities for careers in space-related fields.

All content Copyright © 2010 - 2014 Moonandback Media LLC, except where otherwise noted. All Rights Reserved. Use of this site constitutes acceptance of our Terms of Service, Community Guidelines and Privacy Policy.

moonandback.com

moonandbackproductions.com

takeme2space.com

Advertise with Moonandback Media. Inquiries:

Moonandback Media, LLC
1017 L St., #102
Sacramento, CA 95814-3805

email: email@moonandback.com

Space Links